HyLoft 50175-10 Installationsanleitung Seite 3

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 3
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 2
F
H
G
INSTALL GRIDS
Make sure that all nuts, bolts and screws are tight. Do not load with more than 300 lbs, evenly distributed.
J
J
Place Grids(A) across the two hanging
Support Arm (D) assemblies making
sure the long wires of the Grids (A) are
facing down and overhang is even on
both sides. Quad wires go to the inside
on the center Grids(A) and to the outside
on the outer Grids(A).
Fasten 2 center Grids(A) to Support Bars
(D) through the quad wire section of the
Grids (A) using (4) ¼ x 2" Carriage Bolts
(J) and ¼" serrated nuts (K) as shown.
DO NOT TIGHTEN AT THIS TIME.
Attach two sets of outer Grids (A)
together using two 6-32 x 2" Carriage
Bolts (F), 6-32 washers (H), and 6-32
nuts (G) on both sides. Tighten center
Grids (A) to Support Bars(D).
Quad
wires
Quad
wires
Quad
wires
Seitenansicht 2
1 2 3

Kommentare zu diesen Handbüchern

Keine Kommentare